Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00910
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3111 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
(BOWN TAVERN - BOWN CROSSING - BLDG H) This building is fire sprinklered for story increase and fire area. To construct interior improvements for a new restaurant/bar tenant to be located within a new 6,696 square foot, 2 story building. The fire sprinkler scope of work includes relocating and adding heads to complete coverage as required on the first and second floor. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This permit is attached to BLD06-02349.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/7/20072/7/20072/7/2007PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection1/23/20071/23/20071/23/2007PFAIL
DetailsTroy Cobbley
Items noted on previous correction notice have been correct. Can not final until the ceiling tile has been installed. I notified Jim, the superintendent of this. He stated it would be done friday.
INSP-Final Inspection1/22/20071/22/20071/22/2007PFAIL
DetailsForrest France
Pendent head at the main entry is not correctly installed, provide consistent temp. ratings of sprinklers installed at common fire areas, rough-in at the kitchen drop ceilings is good for cover.
INSP-Sprinkler Rough-in12/21/200612/22/200612/22/2006APART
DetailsForrest France
Rough-in is okay for cover at the hard lid ceilings on the first and second floors only. Two heads at the 1st floor sushi bar soffit to be added and verified for compliance at the next scheduled inspection.