INSP-Final Inspection | 1/30/2007 | 1/31/2007 | 1/31/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled. forward flush passed and the heads have been added at the columns located within the racking.
|
INSP-Final Inspection | 1/25/2007 | 1/26/2007 | 1/26/2007 | P | CANC |
Troy Cobbley
|
|
|
Not ready for inspection
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Troy Cobbley
|
|
|
hydro test passed. system held 210 lbs for 2 hours. sprinkler rough-in passed except column protection is required. Also still need tags, signs and forward flush
|
INSP-Sprinkler Rough-in/Hydro | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | CANC |
Troy Cobbley
|
|
|
Apparently the wrong permit was called in since the contact person did not know about inspection
|
INSP-Sprinkler Rough-in/Hydro | 1/23/2007 | 1/24/2007 | 1/24/2007 | P | CANC |
Forrest France
|
|
|
contact: Jason Hord - OH Hydro Test Phone #: ###-#### x1234
|