INSP-Final Inspection | 1/31/2007 | 1/31/2007 | 1/31/2007 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/29/2007 | 1/29/2007 | 1/30/2007 | P | FAIL |
Troy Cobbley
|
|
|
Can't final until tile is installed. Sprinkler piping can be covered. Insulation has been repaired.
|
INSP-Final Inspection | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Sprinkler Rough-in/Hydro | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | FAIL |
Troy Cobbley
|
|
|
All corrections have been made except there are still problems with the insulation falling and blocking the upright sprinkler heads. Do not cover sprinklers.
|
INSP-Sprinkler Rough-in | 1/22/2007 | 1/22/2007 | 1/22/2007 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for the corrects required as marked in red. This includes the repairing of the insulation which is blocking the upright sprinklersPiping is not to be covered.
|
INSP-Conference | 1/17/2007 | 1/18/2007 | 1/18/2007 | A | DONE |
Troy Cobbley
|
|
|
Inspection was for the hanging obstruction in the open area. I told Matt that the 18" clearance probably does not apply and that there is an obstruction rule in NFPA 13 that would.
|