Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR06-00958
StatusFinaled
Name FIRE PROTECTION SYSTEMS LLC
Site Address 5850 N FIVE MILE RD
Project NameBONAVENTURE PLACE
Customer Number 
ePlanReview 
Description
The data has been moved to a Word document attached to this case.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/24/20079/25/20079/25/2007PPASS
DetailsTroy Cobbley
gilbert - ###-####
INSP-Final Inspection9/21/20079/24/20079/24/2007ACANC
DetailsTroy Cobbley
Cancelled due to alarm panel problems.
INSP-Final Inspection9/20/20079/21/20079/21/2007AFAIL
DetailsTroy Cobbley
Todays inspection covered reinspecting the blocked sprinkler heads through out the building. The only areas not inspected for blockage are the 1st and 2nd floors of D wing.
INSP-Final Inspection9/20/20079/20/20079/20/2007PCANC
DetailsTroy Cobbley
Overbooked with Micron plan review.
INSP-Final Inspection9/17/20079/19/20079/19/2007PCANC
DetailsTroy Cobbley
gilbert was not ready for inspection when I was there with Mike and Ken.
INSP-Final Inspection9/17/20079/17/20079/17/2007PFAIL
DetailsTroy Cobbley
Inspection was for the blocked pendant heads. I found more heads in the first location I looked on the third floor so I ended the inspection
INSP-Final Inspection9/5/20079/6/20079/6/2007AFAIL
DetailsTroy Cobbley
I inspected the second floor wings D, C and B. As with the previous inspection many pendants are blocked and the electrical room is missing coverage. I stopped the inspection until all of blocked heads have been fixed.
INSP-Final Inspection9/4/20079/5/20079/5/2007AFAIL
DetailsTroy Cobbley
The remaining 3rd floor areas were inspected. The same obstructions as noted yesterday occur in the other third floor areas. There was no access into room 397. A canopy was missing from the bathroom pendant in room 374 and no sprinkler coverage was provided in the corridor electrical closet on the third floor C wing. The items from the previous correction notice still need addressed.
INSP-Final Inspection8/31/20079/4/20079/4/2007 FAIL
DetailsTroy Cobbley
The final inspecton for the third floor of A wing was started today. I found that instead of viking pendants being installed reliable pendants had been installed. Also many of the light fixtures are blocking the pendant heads in the laundry/utility romms and in the main corridor. Need to change out heads or resubmit as built plans and data sheets for verification of hydraulic calcs and head spacing. Also need data sheets for the dry s/w heads to verify installation distance below ceilings on patios.
INSP-Supply line flush7/16/20077/17/20077/17/2007APASS
DetailsTroy Cobbley
Underground flush passed.
INSP-Sprinkler Rough-in/Hydro7/2/20077/3/20077/5/2007PPASS
DetailsTroy Cobbley
I finished a hydro and overhead rough to cover inspection at Bonaventure Bldg. B
INSP-Sprinkler Rough-in/Hydro6/26/20076/27/20076/28/2007PPASS
DetailsTroy Cobbley
The hydro for the Attic main piping and second floor passed.
There were some brace issues that were remedied by the end of the inspection.
The intermediate area above the kitchen is being sprinkler because the owner didn’t want to insulate as originally agreed upon. The plans for that revision have been submitted to Brian.
INSP-Sprinkler Rough-in6/25/20076/26/20076/27/2007PCANC
DetailsTroy Cobbley
This part of the project was not ready for inspection.
INSP-Sprinkler Rough-in/Hydro6/22/20076/25/20076/25/2007PCANC
DetailsTroy Cobbley
gilbert; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang Inspection cancelled from web by: Patricia Smith
INSP-Sprinkler Rough-in6/6/20076/7/20076/7/2007APASS
DetailsTroy Cobbley
Third floor tenting passed.
INSP-Sprinkler Rough-in/Hydro6/1/20076/4/20076/5/2007APASS
DetailsTroy Cobbley
Above ground hydro test passed for central building.
INSP-Sprinkler Rough-in/Hydro5/29/20076/1/20076/4/2007APART
DetailsTroy Cobbley
Attic and third floor piping rough in is passed but a tenting inspection is still needed per brian and the hydro test failed.
INSP-Sprinkler Rough-in5/10/20075/11/20075/11/2007APASS
DetailsTroy Cobbley
Area A attic system is ok to cover.
INSP-Sprinkler Rough-in4/20/20074/23/20074/24/2007PPASS
DetailsTroy Cobbley
Third floor wet system and dry system hydro test passed.
INSP-Sprinkler Rough-in/Hydro3/14/20073/14/20073/15/2007PPASS
DetailsTroy Cobbley
The remaining underground supply and FDC piping is ok to cover. Both passed their hydro testes
INSP-Sprinkler Rough-in3/12/20073/13/20073/13/2007APASS
DetailsTroy Cobbley
The underground supply and the supply to the remote FDC is ok to bury from the building up to within 30'-0" of where the FDC is to be located. The second floor of A wing is ok to cover except the earthquake bracing on the 3" mains is not complete.
INSP-Sprinkler Rough-in/Hydro3/8/20073/9/20073/9/2007PPASS
DetailsTroy Cobbley
Above ground hydro test of the first and second floors of building A have passed. The first floor of building A is ok to cover.
INSP-Sprinkler Rough-in/Hydro3/1/20073/2/20073/2/2007APASS
DetailsTroy Cobbley
Underground supply and the remote FDC piping is ok to cover from the stub out to 15' past the patio
INSP-Sprinkler Rough-in/Hydro2/27/20072/28/20073/1/2007AFAIL
DetailsTroy Cobbley
Inspection was for a partial on the underground supply line and remote FDC. Both pipes from the stub out to roughly twenty feet were not at the required bury depth of 4'6". The only piping in the trench was the twenty feet. Also the new FDC location has not been approved yet
INSP-Sprinkler Rough-in/Hydro5/9/20075/10/2007 P 
gilbert - ###-####