Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR06-00990
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 778 W BROAD ST
Project NameBSU BOOKSTORE BODO 7
Customer Number 
ePlanReview 
Description
To construct vanilla shell improvements within an existing 1,077 square foot space located on the ground floor of BODO Building #7. Work is to include wall furring, wall insulation, gypsum wallboard, and suspended ceilings. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Debest Fire Protection to install 13 new SSP's to accomodate new tenant cieling modifications.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/19/20074/20/20074/20/2007PPASS
DetailsForrest France
Fire sprinkler permit finaled, inspection passed.
INSP-Final Inspection3/21/20073/22/20073/26/2007APART
DetailsForrest France
Permit final pending ceiling tile and escutcheon installation.
INSP-Final Inspection2/14/20072/14/20072/14/2007PCANC
DetailsTroy Cobbley
Project was not ready for an inspection.
INSP-Sprinkler Rough-in/Hydro2/9/20072/12/20072/12/2007APART
DetailsTroy Cobbley
The sprinkler piping above the lay-in ceiling tile area is ok to cover. I have a concern with coverage in a ceiling pocket near the under the stairs. Per a conversation with Randy sprinkler protection will be provided there.