INSP-Sprinkler Rough-in/Hydro | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | FAIL |
Troy Cobbley
|
|
|
Per the drawings and a subsequent phone conversation with Randy at DeBest, the sprinkler system in the coolers is designed for a .15 gpm density and is limited to a maximum storage height of 12'-0". The storage height as measured by me is at 19'-0". The system needs to be recalculated to the storage height being used or storage needs to be lowered pemanantly.
|
INSP-Final Inspection | 2/19/2007 | 2/20/2007 | 2/21/2007 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled since the fitter is sick today.
|
INSP-Final Inspection | 2/6/2007 | 2/7/2007 | 2/8/2007 | P | CANC |
Troy Cobbley
|
|
|
Per todd the canopies had to be reordered.
|