INSP-Final Inspection | 11/7/2007 | 11/8/2007 | 11/8/2007 | A | PASS |
Forrest France
|
|
|
Corrections are complete, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/6/2007 | 11/7/2007 | 11/7/2007 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/2/2007 | 11/5/2007 | 11/5/2007 | P | FAIL |
Forrest France
|
|
|
UG hydrostatic testing failed due to pressure loss at the guage below 200psi.
|
INSP-Final Inspection | 9/21/2007 | 9/24/2007 | 9/25/2007 | A | PART |
Forrest France
|
|
|
OH rough-in completed, need to provide flexible fittings for vertical drops to hose connections, also need pressure reducers where system exceeds 100 psi. at the hose valves-see review comments, provide signage at the remote inspectors test connections, repair leakage at the existing UG supply piping, provide weekly pump run schedule or program run timer, need adequate FD roadway access to the pump room.
|
INSP-Final Inspection | 9/19/2007 | 9/21/2007 | 9/21/2007 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing passed inspection.
|
INSP-Final Inspection | 9/12/2007 | 9/13/2007 | 9/14/2007 | A | DEFR |
Forrest France
|
|
|
See inspection notes dated 9/13.
|
INSP-Sprinkler Rough-in/Hydro | 9/14/2007 | 9/14/2007 | 9/14/2007 | A | PART |
Forrest France
|
|
|
Verified completion of c/n items at the pump including repair of the pressure limiting device. Ventilation, EM lighting, and floor drain are acceptable. Noted missing outside waterflow bell, need to program weekly run timer/schedule, fire dpt. access road to the pump house is not adequate, the hydrant at the NE corner of the building is not live. Provide a legible copy of the approved plan set at the next inspection for OH rough-in, still need hydrostatic testing.
|
INSP-Final Inspection | 9/10/2007 | 9/12/2007 | 9/12/2007 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
INSP-Conference | 7/24/2007 | 7/25/2007 | 7/25/2007 | P | PART |
Forrest France
|
|
|
Completed pump acceptance testing per NFPA 20, noted some items in need of correction including mesh at PRV and engine exhaust discharge, FDC needs repair, lock fuel supply open, no galvanized pipe is allowed in the fuel supply line, pump room needs adequate ventilation and a floor drain, provide 3-way valve at jockey sensing guage, tighten bolts at flex exhaust flange, program weekly run timer, the pressure limiting device solenoid is not functioning properly. Pump curve data meets requirements.
|
FIR-Aging Inspection | 6/28/2007 | 6/28/2007 | 6/28/2007 | | DONE |
Forrest France
|
|
|
Work currently underway.
|