INSP-Final Inspection | 3/20/2007 | 3/21/2007 | 3/21/2007 | A | PASS |
Forrest France
|
|
|
Required corrections are verified for completion, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover but one hanger infront of the refrigerator is attached to duct work and will need to be relocated to the building structure.
|