INSP-Final Inspection | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | PASS |
Forrest France
|
|
|
Shell and core fire alarm permit passed final inspection, as-built documentation to be delivered as discussed.
|
INSP-Final Inspection | 12/5/2007 | 12/5/2007 | 12/5/2007 | A | FAIL |
Forrest France
|
|
|
Need correction notice items one and two completed prior to final acceptance, also noted SD covers at three locations.
|
INSP-Final Inspection | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | FAIL |
Forrest France
|
|
|
See correction notice left on site for a list of items needed for permit final.
|
INSP-Final Inspection | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | PART |
Forrest France
|
|
|
Fire alarm passed. Cannot final, pending core and shell final.KR
|
INSP-Final Inspection | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | DEFR |
Forrest France
|
|
|
See inspection comments per M. Timmerman.
|
INSP-Final Inspection | 11/27/2007 | 11/27/2007 | 11/27/2007 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
INSP-Alarm Testing | 11/23/2007 | 11/23/2007 | 11/23/2007 | P | PART |
Forrest France
|
|
|
Inspection activity completed 11/21 including shell and core alarm work for the 4th thru 6th and penthouse testing, also tested sprinkler monitoring for the floor control valves, noted some items in need of correction including programming for the DH release at the trash chute doors, as-built address changes, and field mods.
|
INSP-Alarm Testing | 11/19/2007 | 11/20/2007 | 11/20/2007 | A | PART |
Forrest France
|
|
|
Begin fire alarm testing today including all related elevator control devices, FACP, batteries, phone lines, smoke at panel,FJ and initiation and detection devices for the 1st thru 3rd floors not including sprinkler monitoring tested today. Noted some device address changes, three deleted ID detectors, one pull station at the NW exit is still too high, need to provide a clean set of as-builts for field modifications and a current map at the panel.
|