Permit Information
Permit NumberFIR07-00163
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 7200 W BARRISTER DR
Project NameAda County Jail Medical Unit
Customer Number 
ePlanReview 
Description
Install a new 6” underground service to supply a new riser within this fully sprinklered bldg. The bldg shall be fully sprinklered with two additional risers to be installed for future use. A double interlock pre-action system will be installed to serve through out the Detox cells. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-03515.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/23/200710/24/200710/24/2007APASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection10/17/200710/23/200710/23/2007AFAIL
DetailsTroy Cobbley
One room needs the institutional heads installed, forward flush needs to be performed and a general final walk through.
INSP-Sprinkler Rough-in/Hydro10/15/200710/17/200710/17/2007PPASS
DetailsTroy Cobbley
The hydro test for the header and fdc and the preaction system passed.
INSP-Sprinkler Rough-in/Hydro10/11/200710/15/200710/15/2007APART
DetailsTroy Cobbley
OH Hydro Inspection on the three wet risers passed. The preaction hydro test failed. The riser/header and fdc still needs to be hydro tested.
INSP-Sprinkler Rough-in9/20/20079/21/20079/21/2007APASS
DetailsTroy Cobbley
The sprinkler piping above the layin ceiling tile areas are ok to cover.
INSP-Sprinkler Rough-in9/19/20079/20/20079/20/2007PCANC
DetailsTroy Cobbley
OH Cover Inspection
Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in8/20/20078/22/20078/22/2007PPASS
DetailsTroy Cobbley
See the city approved plans for location where the sprinkler piping is ok to cover
INSP-Sprinkler Rough-in/Hydro8/20/20078/22/20078/22/2007PPASS
DetailsTroy Cobbley
UG Hydro Test and flush passed
INSP-Sprinkler Rough-in8/15/20078/17/20078/17/2007APASS
DetailsTroy Cobbley
See the city approved plans for locations where the spirnkler piping is ok to cover. Ceilings will need to be added in the mechanical closets or the walls will need to extend to the deck. The upright will not suffice. A separation is needed between the sprinklered area and the non-sprinklered area
INSP-Sprinkler Rough-in7/26/20077/31/20077/31/2007APASS
DetailsTroy Cobbley
See the city approved plans for the areas of the medical wing that the rough-in piping is passed and other areas where the piping is ok to cover. I found one retaining strap missing and one drop that was positioned as a sprig up.
INSP-Sprinkler Rough-in/Hydro3/27/20073/28/20073/28/2007APART
DetailsForrest France
The UG fire supply line stub-in and IBR are approved for cover.