INSP-Final Inspection | 4/28/2008 | 4/28/2008 | 4/29/2008 | P | PASS |
Forrest France
|
|
|
Fire alarm permit work scope is approved for final-some locations eclipsed by subsequent tenant fire alarm modifications inspected under respective permits for the 5th and 4th floors.
|
INSP-Alarm Testing | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PART |
Forrest France
|
|
|
Re-inspection for the fire alarm work associated with the 4th floor remodel BLD07-01120 passed, remainder of alarm permit scope of work not yet completed.
|
INSP-Alarm Testing | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | FAIL |
Forrest France
|
|
|
Overspaced SD at the cafeteria, strobe coverage is lacking at one area in the kitchen, audibility is too low for the kitchen service/prep area, remainder of the 4th floor west half as tested is acceptable.
|
INSP-Alarm Testing | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Forrest France
|
|
|
Testing completed for the south half of the 4th floor including one added device, pull stations at the exit stairs, SD at the service elevator, SD for stairwell fans, and retest of the telephone and electrical room detection.
|