INSP-Final Inspection | 7/23/2007 | 7/24/2007 | 7/24/2007 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | FAIL |
Forrest France
|
|
|
Required corrections are complete, final pending repair of a leak at one dry SW head in the garage and system pressurization.
|
INSP-Final Inspection | 6/7/2007 | 6/11/2007 | 6/11/2007 | A | FAIL |
Troy Cobbley
|
|
|
provide the spare heads and wrench, calc sticker, lock the valves, provide verification that the pendant head infront of the range meets the spacing requirements of nfpa 13D, provide canopy for pendant over stairs
|
INSP-Supply line flush | 5/1/2007 | 5/2/2007 | 5/2/2007 | P | PART |
Forrest France
|
|
|
UG supply line flush completed.
|
INSP-Sprinkler Rough-in | 3/19/2007 | 3/20/2007 | 3/20/2007 | A | PART |
Forrest France
|
|
|
OH fire sprinkler install is approved for cover, all field modifications to be indicated on as-built plans.
|
INSP-Sprinkler Rough-in | 3/16/2007 | 3/19/2007 | 3/20/2007 | P | FAIL |
Forrest France
|
|
|
OH fire sprinkler piping is still completely concealed by insulation at the entire basement floor level, proper rough-in inspection cannot be completed until work is exposed.
|
INSP-Sprinkler Rough-in | 3/15/2007 | 3/16/2007 | 3/16/2007 | P | FAIL |
Troy Cobbley
|
|
|
Piping on the main level has changed and heads added. As-builts will be required prior for final. Main level piping can be finished covering. The lower level piping could not be verified since all piping was buried above insulation. I notified the contractor and the builder via phone that the insulation had to come down.
|