INSP-Final Inspection | 7/17/2007 | 7/18/2007 | 7/18/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/16/2007 | 7/17/2007 | 7/17/2007 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection for the hydro test
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro on the wet system passed.
|
INSP-Supply line flush | 7/12/2007 | 7/12/2007 | 7/13/2007 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection
|
INSP-Supply line flush | 7/13/2007 | 7/13/2007 | 7/13/2007 | A | FAIL |
Troy Cobbley
|
|
|
United Water could not find the correct valves to turn on the underground supply. It turns out they are buried in the middle of the street with no road boxes for access. We agreed to return on Monday at 9:00 for a repeat.
|
INSP-Sprinkler Rough-in/Hydro | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Troy Cobbley
|
|
|
The anti-freeze system and underground supply hydro test passed. I also did a life safety walk through with the general contractor.
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PASS |
Troy Cobbley
|
|
|
Hydro test on the anti-freeze system passed. Rough in got a partial on the anti freeze system. Plans and hydraulic calculations will need to be resubmitted due to the changes in this area. I also let the general contractor know that the wall pockets will require sprinkler protection or meet the combustible concealed space requirements of NFPA 13. Per phone call from the architect it sounds like sheet rock will be installed to cover the wood which will be ok.
|