Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-00243
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1455 S CAPITOL BLVD
Project NameMarriott Towne Place Suites
Customer Number 
ePlanReview 
Description
Add fire sprinklers through-out this new 72,923 ft/2 four story 123 unit hotel. The fire sprinklers are being added for area increase. The system will include a wet pipe system serving through-out the heated areas, and a dry pipe system to serve the attic space.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-00456. This permit is also attached to the under ground fire service work permit: FIR06-00727Revised Scope of Work As-Built Dated 01/08/2008:
Add fire sprinklers in the attic space beneath the over builds. This work does not appear to adversely affect the remote area of operation in the attic. The modifications in the attic are noted as Rev. D and dated 01/08/08. Other revisions where minor, such as relocating two heads in the fourth floor corridor. A total of 26 heads were affected as a result of the modifications.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection2/8/20082/11/20082/11/2008APASS
DetailsForrest France
Fire sprinkler system final testing passed, previous correction items are complete, plan resubmittals provided, three defficiencies noted at today's inspection repaired while on site, dry system trip test and DCVA forward flow testing passed. See project related permit FIR06-00727 for the balance of activities and inspections completed for this overhead work listed under the UG permit due to contractor mixing permit #'s for site inspeciton requests.
INSP-Final Inspection1/24/20081/28/20081/28/2008PFAIL
DetailsForrest France
Need plan resubmittals per field inspection notes completed 6/27/07 for the dry system modifications, the paddle style waterflow switch at the dry system riser is not allowed, provide a QR head at the first floor SE storage room, need to provide a seal or lock at the ball valve to the pressure switch at the dry system trim, noted mixed response heads at three rooms on the second floor including 212 and 223, one head at room 236 is obstructed by a light fixture, noted items from the previous inspection at the 1st floor are complete, inspection concluded at this time due to time constraints.
INSP-Sprinkler Rough-in1/14/20081/18/20081/18/2008APART
DetailsForrest France
First floor corridor fire sprinklers are okay for cover with the exception of two pendents in need of relocation due to overspacing from adjacent vestibules to the meeting room, also noted one head blocked by a 4' soffit at the lobby, missing head at the laundry chute termination room, discussed head location at a mech. room, the elevator pit head is not yet installed, missing escutcheons at some locations.
INSP-Sprinkler Rough-in/Hydro8/9/20078/10/20078/10/2007APART
DetailsForrest France
Heads at the laundry chute are okay for cover, noted one hanger at the 2nd floor piping to the chute in need of attatchment.