INSP-Final Inspection | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/27/2007 | 6/28/2007 | 6/29/2007 | P | PASS |
Troy Cobbley
|
|
|
UG Flush passed
|
INSP-Supply line flush | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | FAIL |
Troy Cobbley
|
|
|
UG Flush Inspection was not ready. I performed a partial sprinkler rough-in and noted deficiencies such as upright heads blocked by duct work, missing protection under stair landings and upright heads not centered between the trusses.
|
INSP-Sprinkler Rough-in | 4/23/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground supply piping is ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PASS |
Troy Cobbley
|
|
|
The underground stub-out and 20"-0" of pipe from the stubout is ok to bury.
|