Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00253
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 960 S BROADWAY AVE Unit: 500
Project NameUNIVERSITY PLAZA-5TH FLR
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
This TI in suite #500 of this 6 story bldg. includes dropping 51 heads into the new wall and ceiling layout through-out the affected area of the 13,132 ft/a floor. The work shall be performed in accordance with NFPA13 installation guidelines. The fire sprinkler system work shall comply with IFC 2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD7-00138.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/16/20074/16/20074/16/2007PPASS
DetailsForrest France
Fire sprinkler work passed final inspection.
INSP-Sprinkler Rough-in/Hydro4/9/20074/9/20074/9/2007PPART
DetailsForrest France
Fire sprinkler install is approved for cover as noted.
INSP-Sprinkler Rough-in/Hydro4/6/20074/9/20074/9/2007AFAIL
DetailsForrest France
The modifications and installation must remain exposed for inspection prior to cover, need to remove ceiling tiles at affected areas, also need to provide approved plans on site as required.