Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00278
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8249 W OVERLAND RD Unit: 150
Project NameOVERLAND RETAIL PLAZA
Customer Number 
ePlanReview 
Description
o construct a new finished 1399 sq. ft. interior finish for T-Mobile. Work includes new wood framed partitions with gyp. board, suspended ceiling, one restroom and two support offices. Fire sprinklers are regulated by Boise Fire. Note: This building is fully sprinklered for allowable area increase. Shilo Automatic Sprinkler Company to move existing SSU sprinklers to accomodate new attic spacing. Also add new SSPsprinklers to accomodate new walls and ceiling.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/21/20075/21/20075/21/2007PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection5/17/20075/21/20075/21/2007AFAIL
DetailsTroy Cobbley
No access to tenant but I could see there were no canopies on the pendant heads. Inspection failed.
INSP-Sprinkler Rough-in4/30/20075/1/20075/1/2007APASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover
INSP-Sprinkler Rough-in4/26/20074/27/20074/27/2007AFAIL
DetailsTroy Cobbley
Pendant heads exceed the original design of 120sq/ft. Infact they exceed 130 sq/ft allowed for ordinary hazard. The existing upright heads are spaced at 165 sq/ft along the west wall and the piping to the pendants is hung from the bottom cord of the trusses. Uprights will need to be added and the hangers moved to the top of the truss or provide documentation that they can be hung from the bottom as discussed.