INSP-Final Inspection | 10/23/2007 | 10/24/2007 | 10/24/2007 | P | PASS |
Forrest France
|
|
|
Final fire sprinkler inspection passed, permit finaled.
|
INSP-Sprinkler Rough-in | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PART |
Forrest France
|
|
|
DP rough-in at the entry vestibule, head relocation and head change for the lobby including suite 110 are satisfactory, also inspected temp. ssu protection at suite 130, no access provided for the remainder of the building to verify head replacement completion.
|