Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-00377
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 855 W BROAD ST Unit: 300
Project NameSPR-9TH STREET WAREHOUSES
Customer Number 
ePlanReview 
Description
"modification permit" work at 3rd floor to modify 1'14" branchlines around HAVC VAV boxes, to ductwork can come out of box We have serveral of these locations with the same centerline & fire sprinkler line will be the one to move 9th street warehouse was orgininal project name the entire area & facility is 100% fire sprinklered. System will be back in service each night. Existing bldg 3rd floor was installed in 1998 @ light harzard. 1st and 2nd floor were installed @ OH GRPII. Density. Remodel of this 3rd level will be submitted at a later date (by April 30th) Final design submittal of as built drawings shall be turned in at end of project as plan modification for recalculation of final permit fee.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/18/200812/18/200812/18/2008PPASS
DetailsForrest France
Scope of work indicated per documents completed, permit finaled.
INSP-Sprinkler Rough-in7/30/20077/31/20078/1/2007AFAIL
DetailsForrest France
See stamped plans for areas inspected and approved, circled locations for heads in need of replacement, obstructed or overspaced as noted.
INSP-Sprinkler Rough-in/Hydro7/20/20077/23/20077/23/2007APART
DetailsForrest France
Defficiencies noted at the previous inspection are repaired, noted on stamped plan set areas okay for cover, discussed project scheduling.
INSP-Sprinkler Rough-in7/18/20077/20/20077/20/2007APASS
DetailsTroy Cobbley
See the city approved plans for the locations where the sprinkler piping can be covered. I found one pipe in the restroom appears to be leaking. I pointed this out to dave the fitter.