INSP-Final Inspection | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Forrest France
|
|
|
Fire sprinkler final inspection passed per K. Roule.
|
INSP-Sprinkler Rough-in/Hydro | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | PART |
Forrest France
|
|
|
Overhead hydrostatic test for the two wet systems and the antifreeze loop passed, remainder of OH install is complete and corrections made, noted one pendent head to be changed to a 155 deg as discussed.
|
INSP-Sprinkler Rough-in | 8/10/2007 | 8/13/2007 | 8/13/2007 | P | PART |
Forrest France
|
|
|
OH install is approved except as highlighted on approved plans for areas not completed including two stairways and the antifreeze loop, also noted one missing hanger on the 2nd floor, discussed WPI and FDC locations as well.
|
INSP-Sprinkler Rough-in | 8/9/2007 | 8/10/2007 | 8/10/2007 | A | CANC |
Forrest France
|
|
|
Inspection rescheduled per phone call from contractor.
|
INSP-Supply line flush | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | PART |
Forrest France
|
|
|
UG supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | PART |
Forrest France
|
|
|
UG hydrostatic test passed within allowable limits per NFPA 13.
|
INSP-Sprinkler Rough-in/Hydro | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | CANC |
Troy Cobbley
|
|
|
Can not perform inspection due to time constraints. Will have to be rescheduled.
|
INSP-Supply line flush | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | CANC |
Troy Cobbley
|
|
|
Can not perform inspection due to time constraints. Will have to be rescheduled.
|