Permit Information
Permit NumberFIR07-00449
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 6001 W CASSIA ST
Project NameBorah Gym Addition
Customer Number 
ePlanReview 
Description
Scope of Work: Overhead Only
Add a wet pipe sprinkler system through out the Gym expansion for area increase. This permit begins from the discharge side of the existing back flow device inside of the riser room. The underground and Back Flow device were pre-existing. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD06-02968.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/28/20083/31/20083/31/2008APASS
DetailsTroy Cobbley
Permit finaled. Forward flush passed.
INSP-Final Inspection3/27/20083/28/20083/28/2008ACANC
DetailsTroy Cobbley
Final Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
INSP-Sprinkler Rough-in/Hydro2/21/20082/22/20082/22/2008APASS
DetailsTroy Cobbley
Second floor hydro test passed
INSP-Sprinkler Rough-in/Hydro2/21/20082/21/20082/21/2008PPASS
DetailsTroy Cobbley
First floor hydro test passed.
INSP-Sprinkler Rough-in/Hydro2/15/20082/19/20082/19/2008AFAIL
DetailsTroy Cobbley
1st floor OH Hydro test failed.
INSP-Sprinkler Rough-in2/8/20082/11/20082/11/2008PPASS
DetailsTroy Cobbley
The fire proof patching has been completed. Sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in1/23/20081/24/20081/24/2008APASS
DetailsTroy Cobbley
See the city approved plans for the three locations where pipin is ok to cover. These areas include the east and west entry lobbies and the east restrooms. The fire proofing has not been repaired yet above the lay-in tile areas and cannot be covered.
INSP-Sprinkler Rough-in1/21/20081/22/20081/22/2008APART
DetailsTroy Cobbley
OH Cover inspection as far as the sprinkler piping installation is ok but alot of fire proofing has been damaged by all of the trades and will need to be repaired prior to the installation of the ceiling. I notified the superintendant of this.
INSP-Sprinkler Rough-in1/11/20081/11/20081/11/2008PPASS
DetailsTroy Cobbley
See the city approved plans for locations where the sprinkler piping can be covered. The areas looked at today included piping above the lay in ceiling tile on the east side of the building.
INSP-Sprinkler Rough-in12/4/200712/5/200712/5/2007APASS
DetailsTroy Cobbley
See the city approved plans for the two location in the entry vestibules where the sprinkler hangers are ok to cover.
INSP-Sprinkler Rough-in11/21/200711/26/200711/26/2007PPASS
DetailsTroy Cobbley
Todays inspection was for the hanger attachments that will be buried above the insulation in the north side girls and boys restrooms. The hanger attachments are ok to cover.
INSP-Sprinkler Rough-in11/15/200711/16/200711/16/2007APASS
DetailsTroy Cobbley
See the city approved plans for hard lid locationes where sprinkler piping is ok to cover.
FIR-Aging Inspection9/7/20079/7/20079/14/2007 NR
DetailsTroy Cobbley
work is in progress