Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00461
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 6411 W FAIRFIELD AVE
Project NameMcKinley Elementary School
Customer Number 
ePlanReview 
Description
Scope of Work: Under Ground Only
Beginning from an existing 6” C900 line stubbed in from the street off of W. Fairfield Ave., continue the 6” out and stub up into the riser room of the new 59,007-ft/2 bldg. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 the IFC-2003, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD07-00143.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/26/20091/28/20091/28/2009PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro3/25/20083/26/20083/26/2008APASS
DetailsTroy Cobbley
UG Hydro Inspection passed
INSP-Sprinkler Rough-in3/24/20083/25/20083/25/2008APASS
DetailsTroy Cobbley
UG Flush Passed
INSP-Sprinkler Rough-in3/20/20083/24/20083/24/2008AFAIL
DetailsTroy Cobbley
This inspection was for an underground flush. The contractor had set up the flush through a 2 1/2" hose. The system riser is 4". Without a pito guage the actual flow could not be verified so no flush was performed. The underground flush shall conform to NFPA 13 10.10.2.1.3.
INSP-Sprinkler Rough-in10/30/200710/31/200710/31/2007APASS
DetailsTroy Cobbley
The underground piping is ok to cover but the installation does not match the plans. Additional fitting have been added as well as additional piping. I'm contacting DeBest Fire about my concerns.
INSP-Sprinkler Rough-in7/3/20077/3/20077/3/2007PPASS
DetailsTroy Cobbley
5'0" underground stub out is ok to cover