INSP-Final Inspection | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Troy Cobbley
|
|
|
The remaining exposed piping is ok to cover. The contractor owes me an as-built plan as per the scope of work. After canopies and ceiling tile have been verified this project can be finaled
|
INSP-Sprinkler Rough-in | 8/23/2007 | 8/23/2007 | 8/24/2007 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for locations where the piping is ok to cover.
|
INSP-Sprinkler Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Troy Cobbley
|
|
|
Three more sprinkler heads in the first floor corridor are ok to cover. Rick removed conduit that was attached to the piping as I waited.
|
INSP-Sprinkler Rough-in | 8/14/2007 | 8/14/2007 | 8/14/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping in the CEO corridor and the adjacent offices is ok to cover.
|
INSP-Sprinkler Rough-in | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | PASS |
Troy Cobbley
|
|
|
The elevator lobby sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in | 7/23/2007 | 7/23/2007 | 7/23/2007 | P | PART |
Troy Cobbley
|
|
|
The six sprinkler heads in the corridor junction are ok to cover.
|