Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00497
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 5804 W FAIRVIEW AVE
Project NameCAROLS DESIGN HOUSE
Customer Number 
ePlanReview 
Description
The Permitted Work Scope:
The fire sprinkler scope of work includes relocating and adding heads to complete coverage as required accommodating a new ceiling layout. The work also includes changing out all of the existing heads to quick response. A new anti-freeze loop will be added to protect the exterior entry way. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This permit is attached to BLD07-00913.
When tenant work affects fire sprinkler protection outside the permitted work area. The affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification.08/30/07 Revised Permitted Work Scope:
This 2nd review is the result of an IFC Life Safety field inspectors request due to changes made in the field. The piping and head layout changes made do not appear to adversely affect the operation of the sprinkler system as it was designed. Revision notes dated 08/21/07 would apply.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/28/20087/28/20087/28/2008PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection8/21/20078/22/20078/22/2007PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro8/6/20078/7/20078/7/2007APASS
DetailsTroy Cobbley
Hydro tests for the anti-freeze system and the overhead system passed.
INSP-Sprinkler Rough-in/Hydro8/3/20078/6/20078/6/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the locations where the sprinkler piping can be covered. The long branchline located along the north side of the building is now sized at all 2" with a bunch of new pendants. I told Russ that this will have to be resubmitted. This area is not approved for cover especially since there is exposed wood above the ceilings. Per the general contractor the wood will be covered.
INSP-Sprinkler Rough-in/Hydro7/9/20077/10/20077/10/2007PPASS
DetailsTroy Cobbley
See the city approved plans for locations where the piping can be covered. The upright heads above the restrooms are overspaced. I went over this with Russ.
INSP-Sprinkler Rough-in/Hydro6/29/20076/29/20076/29/2007PPASS
DetailsTroy Cobbley
See the city approved plans for the locations where the sprinkler piping can be covered. I also spoke with the building contractor about the fire blocking and sprinkler issues in the furred out walls.