INSP-Final Inspection | 4/23/2009 | 4/24/2009 | 4/24/2009 | P | PASS |
Forrest France
|
|
|
SECOND VISIT for failed first inspection items completed today including retest of post indicator valve, retest for non-functional notification devices, testing for mag lock FA interconnection at the main entry doors, checked relocated 3rd floor manual pull stations, adjusted dB levels at ADA and staff restrooms, map at panel, and elevator controls, supervising station signals checked okay. Fire alarm permit finaled.
|
INSP-Final Inspection | 4/17/2009 | 4/20/2009 | 4/20/2009 | P | CANC |
Troy Cobbley
|
|
|
I spoke to TIm about rescheduling this inspection due to a conflict of interest.
|
INSP-Final Inspection | 4/10/2009 | 4/13/2009 | 4/13/2009 | P | CANC |
Forrest France
|
|
|
|
INSP-Final Inspection | 7/21/2008 | 7/21/2008 | 7/21/2008 | A | FAIL |
Forrest France
|
|
|
See annotations on approved plan set for locations of areas or items in need of correction including 3rd floor MP stations, dB levels at ADA bathrooms and one staff restroom, two non-functional notification devices, PIV tamper self restoring signal per note #7, fire alarm interconnection to the mag locks at the main entry/exit doors, provide map at the panel per review note #24. FACP batteries, phone lines, sd, HD at the mech. room, sprinkler riser supervision, elevator controls with the exception of hoistway devices and voltage monitoring all tested okay.
|
FIR-Aging Inspection | 12/10/2007 | 12/10/2007 | 12/10/2007 | | DEFR |
Forrest France
|
|
|
Work in progress, pending field inspection request.
|