INSP-Final Inspection | 11/2/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Forrest France
|
|
|
Required corrections have been verified for completion, final fire alarm inspection passed, permit finaled.
|
INSP-Final Inspection | 10/23/2007 | 10/25/2007 | 10/26/2007 | P | FAIL |
Forrest France
|
|
|
See approved plans 1st floor for areas in need of repair including three SD to be relocated, strobes are not in sync at the pool room, fireman's hat needs to illuminate solid upon activation of the SD at the elevator lobby, need to test EOL, provide signals report at next inspection, noted corrections have been verified from the previous inspection.
|
INSP-Final Inspection | 9/7/2007 | 9/7/2007 | 9/11/2007 | P | DEFR |
Forrest France
|
|
|
See inspection comments completed 9/10.
|
INSP-Final Inspection | 9/5/2007 | 9/6/2007 | 9/10/2007 | A | DEFR |
Forrest France
|
|
|
See inspection comments on 9/10.
|
INSP-Final Inspection | 9/7/2007 | 9/10/2007 | 9/10/2007 | A | FAIL |
Forrest France
|
|
|
Approved plans must be on site per condition of the permit, also need to provide as-builts reflecting field modifications, visible notification appliances in the sleeping areas must meet NFPA 72 7.5.4.4.2., need to provide signage at the doors to the FACP, provide key for the lock at the PIV to enable testing, provide map at the panel. Panel batteries, AC loss, sprinkler monitoring(except PIV) tested okay, verifed signals recieved.
|
INSP-Final Inspection | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | CANC |
Forrest France
|
|
|
Overbooked
|