INSP-Final Inspection | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | PASS |
Troy Cobbley
|
|
|
Permit is finaled
|
INSP-Sprinkler Rough-in/Hydro | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | CANC |
Troy Cobbley
|
|
|
No time to make a return trip today
|
INSP-Final Inspection | 8/20/2007 | 8/21/2007 | 8/21/2007 | P | CANC |
Troy Cobbley
|
|
|
dan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for painted head, obstruction and hanging insulation problems
|
INSP-Sprinkler Rough-in | 7/31/2007 | 8/1/2007 | 8/1/2007 | P | FAIL |
Troy Cobbley
|
|
|
Mike wanted the piping above the soffit to be inspected but I found that the 2 1/2" piping on the plan is actually 3" piping in the field. Also it appears the piping running back to the riser may be a different size. Also per the fire sprinkler contractor alot of heads have added and as-builts have been submitted but this main size issue has not been reflected on the as-built plans.
|