INSP-Final Inspection | 3/11/2008 | 3/12/2008 | 3/12/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | PART |
Forrest France
|
|
|
24 hr. air test for the preaction system passed, overhead install is approved for cover at the drop ceilings with the exception of two noted locations which will need coverage adjustment-see approved plans for annotations.
|
INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | PART |
Forrest France
|
|
|
Begin pneumatic testing of the preaction system at 12:00 @ 46psig.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/2007 | 10/30/2007 | 10/31/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test completed for both the wet and preaction systems.
|