Permit Information
Permit NumberFIR07-00585
StatusFinaled
Name DEBEST FIRE PROTECTION
Site Address 10151 W RIFLEMAN LN
Project Name 
Customer Number 
ePlanReview 
Description
Scope of Work
ELDORADO 4-PLEX BLDG #2 * To install a fire life safety NFPA 13R system to prevent flashover (total involvement) in the room of fire origin, where sprinklered, and to improve the chance for occupants to escape or be evacuated, in a new 5,641-ft/2 two story, four unit apartment building starting at the top of a 2” Watts Series 007 Backflow Double Check control by others. An NFPA 13R fire sprinkler protection system is required for compensation for the lack of Fire Department access per 503.1.1, Exception 1. System shall be equipped with an alarm initiating device connected to an alarm system and an outside annunciating devise. All fire sprinkler work and related, which includes dual service underground water supply, the system backflow prevention device (provided by others), shall be per NFPA 13R, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD07-00602.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/20/200712/20/200712/20/2007PPASS
DetailsTroy Cobbley
permit finaled
INSP-Sprinkler Rough-in/Hydro12/6/200712/7/200712/7/2007APASS
DetailsTroy Cobbley
OH Hydro Inspection passed
INSP-Sprinkler Rough-in/Hydro12/4/200712/5/200712/5/2007AFAIL
DetailsTroy Cobbley
Overhead hydro test failed
INSP-Sprinkler Rough-in/Hydro12/3/200712/4/200712/4/2007PCANC
DetailsTroy Cobbley
OH Hydro Inspection needs rescheduled due to time constraints.
INSP-Sprinkler Rough-in/Hydro11/28/200711/29/200711/29/2007AFAIL
DetailsTroy Cobbley
OH Hydro failed
INSP-Sprinkler Rough-in/Hydro10/30/200710/31/200710/31/2007AFAIL
DetailsTroy Cobbley
Overhead hydro failed due to loss of pressure and the fdc not being tested.
INSP-Supply line flush10/3/200710/4/200710/4/2007APASS
DetailsTroy Cobbley
UG Flush passed
INSP-Sprinkler Rough-in9/26/20079/27/20079/27/2007APASS
DetailsTroy Cobbley
The spirnkler piping is ok to cover.
INSP-Sprinkler Rough-in9/21/20079/24/20079/24/2007APASS
DetailsTroy Cobbley
The sprinkler piping is ok to cover. The general contractor agreed to provide pictures of the insulation to be placed behind the dry sidewall heads. Also the dry sidewall heads at the patios need to be reaised or the underside of the deck above lowered.
INSP-Sprinkler Rough-in9/19/20079/20/20079/20/2007ACANC
DetailsTroy Cobbley
See yesterdays inspection comments.
INSP-Sprinkler Rough-in9/18/20079/19/20079/19/2007ACANC
DetailsTroy Cobbley
This project not inspected due to contractor wanting to make a determination on obstructions due to issues found at FIR07-00586. It will be rescheduled when a decision is made.