Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR07-00640
StatusFinaled
Name ROMAR ELECTRIC
Site Address 1055 N CURTIS RD
Project NameST AL'S-1ST FLR
Customer Number 
ePlanReview 
Description
This permit is to install new notification appliance power panels and add new audible visual notification appliances in a tenant improvement space called Carpet Row and CEO Office. The project includes new corridor smoke detectors, manual pull station, door hold opens. Building permit BLD07-00889 is to construct non-combustible fire-resistive walls to create a CEO, COO, Reception/Waiting and Work Area Rooms. To remove a 4'-4" portion of the existing 2-hour Horizontal Exit concrete wall to allow installation of a 1-1/2-hour, automatic closing, smoke detector activated, fire door assembly (door/frame/hardware); install new doors and hardware as specifically noted Sheet A101 & Specifications Section 08000. To upgrade millwork, finishes, electrical, mechanical, plumbing, fire sprinkler and alarm systems. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/8/20081/9/20081/9/2008APASS
DetailsTroy Cobbley
Permit finaled
INSP-Alarm Testing12/4/200712/5/200712/5/2007AFAIL
DetailsTroy Cobbley
All of the a/v's were tested. See the city approved plans for one that did not work and will need replaced and retested. When we started testing the smoke detectors I found that the operation of the smoke detectors in the middle of the corridors did not match the alarm matrix which showed their operation releasing the doors. As programed now only the smoke detectors near the doors are releasing the door hold opens. This would be ok but not all of the smoke detectors are with in 5'-0" of the doors as required. The inspection was stopped until a decision is made on how the smoke detectors are going to function.
INSP-Final Inspection11/21/200711/27/200711/27/2007ACANC
DetailsTroy Cobbley
###-#### - bud Cancelled due to additional strobe being required on the latest plans.
INSP-Final Inspection11/16/200711/20/200711/20/2007AFAIL
DetailsTroy Cobbley
The electrician stated that his office had contacted mike timmerman and it was ok to provide as-builts for the devices in the added corridor. I called to verify this with mike and he stated he could not recall any such conversation. The corridor appears to be an addition to the scope of work and should be resubmitted. No testing was performed since Ceicil with Kriezenbeck Const. did not want to have to disrupt the hospital twice for the fire alarm test.
INSP-Final Inspection9/25/20079/26/20079/26/2007APART
DetailsTroy Cobbley
The inspection for today covered only the office for the CEO, COO and Receiving. The devices in the offices and immediately outside in the corridor were tested. See the city approved plans for specific devices tested.