INSP-Final Inspection | 11/28/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
Forrest France
|
|
|
Final inspection passed, field modifications are approved, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | PART |
Forrest France
|
|
|
Work completed is outside this permit scope, notified contractor to obtain a quick permit for the six relcoated heads at the first floor hallway.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | PART |
Forrest France
|
|
|
Overhead install is acceptable, need as-built plans showing field modifications at the escalator.
|