INSP-Final Inspection | 1/16/2008 | 1/17/2008 | 1/17/2008 | P | PASS |
Forrest France
|
|
|
Balance of fire alarm permit work testing completed today, noted one air return grill at the sacrisity hall to be relocated away from an adjacent SD, address changes at two devices made while on site, will verifiy current map at the panel and relocated hvac at the building final, permit finaled.
|
INSP-Final Inspection | 10/29/2007 | 10/31/2007 | 10/31/2007 | P | PART |
Forrest France
|
|
|
Items on correction notice verified for completion, fire alarm permit finaled.
|
INSP-Final Inspection | 10/25/2007 | 10/26/2007 | 10/26/2007 | P | FAIL |
Forrest France
|
|
|
test fire alarm panel, found that batterys in for fire alarm panel were incorrect, plans show 2, 110 AH batterys the batterys on site were only 50 AH, need to put in corrected batterys. Halway by restrooms will need a smoke added due to change in the plans. Elevator does not recall, does'nt have recall capabilities, could not verify detector in elevator shaft no access. relocate detector in kitchen. per KR
|