INSP-Final Inspection | 9/27/2007 | 10/3/2007 | 10/3/2007 | A | PASS |
Forrest France
|
|
|
Required corrections have been completed, fire sprinkler permit finaled.
|
INSP-Final Inspection | 9/20/2007 | 9/26/2007 | 9/26/2007 | A | PART |
Forrest France
|
|
|
Noted three upright heads at mechanical room 000Y which exceed the max. allowable distance below the deck for proper response time- the mech. piping above the heads does not provide adequate heat collection. The remainder of overhead installation is acceptable.
|
INSP-Final Inspection | 9/18/2007 | 9/21/2007 | 9/20/2007 | P | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
INSP-Final Inspection | 9/17/2007 | 9/19/2007 | 9/18/2007 | A | CANC |
Forrest France
|
|
|
complete fire sprinkler inspection. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2007 | 8/29/2007 | 8/29/2007 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification that the 1/2" piping to the sprinkler heads and the tape separation on the piping/hangers was allowed under the code in which the buidling was built. See the city approved plans for locations where sprinkler heads need to be changed from 200 to 155 degrees. Also see the plans where the clouded area is the only area not inspected.
|