Permit Information
Permit NumberFIR07-00702
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameST LUKES-3 EAST TOWER
Customer Number 
ePlanReview 
Description
Original Permitted Work Scope: The fire sprinkler scope of work includes modifying the existing system by adding and relocating 215 new down heads on the 3rd floor of the East Wing to accommodate a new wall and ceiling layout in the patent rooms. This permit is attached to BLD07-01690. When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. 10/01/07 Revised Permitted Work Scope:
This was a review of a previously approved plan that was modified to meet requirements during construction. "Scope of Work", St. Luke's RMC had required all COU rooms to have the same fire wall corridor that is in the East Tower. These rooms will be fed off of the East Tower system #17. All existing East Annex system #48 piping will be demo'd and capped in this area. Sprinkler head layout will remain the same as previously submitted. The fire sprinkler scope of work includes modifying the existing system by tying a new 1.5” branch line into the existing east system to supply 10 heads along the fire wall between column lines 35 – 37 & N2 – J9. Noted as revision 1, dated 09/18/07 on sheet FP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/3/20086/4/20086/4/2008APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection6/2/20086/3/20086/3/2008ADEFR
DetailsForrest France
cole Phone #: ###-####
INSP-Final Inspection5/27/20085/28/20085/28/2008APART
DetailsForrest France
Previous c/n items are finished, rough-in approved for cover as red lined on plans.
INSP-Sprinkler Rough-in5/23/20085/27/20085/27/2008AFAIL
DetailsForrest France
Inspection for cover failed at four locations-see plan set for annotations including missing coverage at one storage room, blocked pendent at a patient room by an adjacent curtain track, one overspaced hanger at the corridor, one head to be relocated due to blockage by a cabinet, mc cable is not to be attatched to sprinkler hanger rods-removed while on site, remainder of ceilings are okay for cover as initialed with today's date.
INSP-Sprinkler Rough-in5/22/20085/23/20085/23/2008APART
DetailsForrest France
See approved plans for areas okayed to date.
INSP-Sprinkler Rough-in5/21/20085/22/20085/22/2008APART
DetailsForrest France
See areas red-lined on plan set for ceiling cover approved, field tile is not to be installed prior to rough-in inspection at the remainder of project remodel.
INSP-Sprinkler Rough-in5/20/20085/20/20085/20/2008PFAIL
DetailsTroy Cobbley
Almost all of the ceiling tile has been installed prior to a rough-in inspection. I let Cole know that the ceiling tile needs to come back out. Only the areas as marked on the approved plans were ok to cover. No inspection performed.
INSP-Sprinkler Rough-in1/31/20081/31/20081/31/2008PPASS
DetailsTroy Cobbley
See the city approved plans for the two rooms that were approved for cover today.
INSP-Sprinkler Rough-in1/25/20081/28/20081/28/2008APART
DetailsForrest France
Refer to annotations on plans for areas where the overhead rough-in can be covered at the drop and hard lid ceilings.
INSP-Sprinkler Rough-in12/28/200712/31/200712/31/2007APART
DetailsForrest France
Overhead fire sprinkler work at four hard lid ceiling areas as initialed and dated on plan set are okay for cover.
INSP-Sprinkler Rough-in/Hydro11/26/200711/27/200711/27/2007APART
DetailsForrest France
See stamped plans for rooms initialed as approved for cover.
INSP-Sprinkler Rough-in10/30/200710/31/200710/31/2007APART
DetailsForrest France
See areas noted on approved plans okay for cover at the hard lids including soffits and restrooms.