Permit Information
Permit NumberFIR07-00707
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 10247 W ASPEN MEADOW ST
Project Name 
Customer Number 
ePlanReview 
Description
Scope of Work - Beginning from the supply side of the Back Flow Device, (Supplied By Others) To install a (modified) life safety NFPA 13D system in a new two story, single family dwelling of 3205-ft/2 including a 2nd floor Bonus Room. The modification is the installation of a single row of dry sidewall sprinklers along the common wall attached to the garage and the living space. System shall be equipped with an alarm initiating device and an outside alarm. All fire sprinkler work and related, which includes dual use, single service water supply, the system backflow prevention device (provided by others), shall be per IFC2003 903, NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD07-01636. 09/28/07 Revised Scope of Work
These previously approved plans were resubmitted for review due to owner changes made in the Master Bedroom which resulted in an adverse affect on the remote area of sprinkler operation. The revised piping plan and calculation submitted are approved.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/8/20081/9/20081/9/2008PPASS
DetailsTroy Cobbley
Corrections made per Troys notes. KR
INSP-Final Inspection1/7/20081/8/20081/8/2008PFAIL
DetailsTroy Cobbley
The riser needs to be located within 1 1/2" of the wall as per the installation guide. Alarm interconnection needs to be tested. Underground flush is passed.
INSP-Final Inspection1/3/20081/4/20081/4/2008ACANC
DetailsTroy Cobbley
Per sam the project is not ready for final.
INSP-Sprinkler Rough-in9/14/20079/14/20079/14/2007PPASS
DetailsTroy Cobbley
Sprinkler piping is ok to cover
INSP-Sprinkler Rough-in9/12/20079/13/20079/13/2007PPART
DetailsTroy Cobbley
The sprinkler rough-in is ok but the tenting is not done yet. The sprinkler piping can not be covered yet. Plans need to be resubmitted since a sprinkler head has been added in the single head calc area. It appears this area is now the new two head remote area.