INSP-Final Inspection | 1/10/2008 | 1/10/2008 | 1/10/2008 | A | PASS |
Forrest France
|
|
|
Scope of work for this permit finaled. see FIR07-00913 for over head work and additional comments. KR
|
INSP-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm permit work inspection.
|
INSP-Sprinkler Rough-in/Hydro | 12/19/2007 | 12/19/2007 | 12/19/2007 | P | PART |
Forrest France
|
|
|
OH hydrostatic test for the basement and 2nd floor wet systems passed inspection.
|
INSP-Sprinkler Rough-in/Hydro | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PART |
Forrest France
|
|
|
Over head hydro 1st floor passed.See approved set of plans for any red lined areas.KR
|
INSP-Sprinkler Rough-in/Hydro | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PART |
Forrest France
|
|
|
See approved plan set for areas inspected today.
|
INSP-Conference | 10/1/2007 | 10/1/2007 | 10/1/2007 | A | DONE |
Forrest France
|
|
|
On site conference to discuss project shell and tenant work interface, also discussed second floor ceilings.
|