INSP-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | PASS |
Forrest France
|
|
|
Noted field modifications, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PART |
Forrest France
|
|
|
Conference to discuss fire sprinkler head locations as field installed.
|
INSP-Conference | 11/5/2007 | 11/6/2007 | 11/7/2007 | A | NH |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: Wayne Berry
|
INSP-Conference | 10/31/2007 | 11/1/2007 | 11/1/2007 | A | NR |
Forrest France
|
|
|
Inspection rescheduled per contractor.
|