INSP-Final Inspection | 10/26/2009 | 10/26/2009 | 10/26/2009 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 11/29/2007 | 11/30/2007 | 11/30/2007 | P | PART |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 11/29/2007 at 5:00:15 PM. Contact: ###-####. Noted two pendent heads at the east side have been changed to QR as discussed. Sprinkler final pending removal of tape at covered uprights and escutcheons at hard lid ceilings when painting and sheetrock patching is completed. Contact phone number is incorrect, line has been disconnected.
|
INSP-Sprinkler Rough-in | 9/19/2007 | 9/20/2007 | 9/21/2007 | A | PART |
Forrest France
|
|
|
Two existing standard response heads at the east corner need to be QR type matching the new heads installed in the same fire area, also missing hangers at five arm-overs to new pendent heads, see plans for annotations, rough-in approved for cover pending corrections.
|