INSP-Final Inspection | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PASS |
Forrest France
|
|
|
All corrections made,per last inspection notes. KR
|
INSP-Final Inspection | 12/4/2007 | 12/6/2007 | 12/6/2007 | A | FAIL |
Forrest France
|
|
|
Missing caps at the FDC, need to remove the allen wrench from the flow switch at the main riser and replace the cover ASAP, provide a current annual inspection for the existing system, need resubmitted plans available on site at the next inspection.
|
INSP-Sprinkler Rough-in | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | PART |
Forrest France
|
|
|
Okay for sheetrock install at the basement level and the first floor restrooms, contractor to comply with listed min. spacing requirements of the residential heads installed, noted possible light fixture obstructions due to close proximity of heads and electrical junction boxes at some locations, will need resubmitted plans at next inspection for verification of field mods.
|