INSP-Final Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Supply line flush | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed.
|
INSP-Sprinkler Rough-in/Hydro | 11/27/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed
|
INSP-Sprinkler Rough-in | 11/13/2007 | 11/13/2007 | 11/13/2007 | P | PASS |
Troy Cobbley
|
|
|
The underground tie in to the United Water line is complete and ok to bury.
|
INSP-Supply line flush | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | FAIL |
Troy Cobbley
|
|
|
The inspection was called in for a flush but what was actually needed was a cover inspection for the 8" underground supply. The underground piping is ok to cover.
|