INSP-Final Inspection | 12/15/2010 | 12/16/2010 | 12/16/2010 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
FIR-Aging Inspection | 12/2/2010 | 12/2/2010 | 12/7/2010 | | NR |
Troy Cobbley
|
|
|
This permit and the building permit information have been forwarded to Scott and Jennifer after the owner contacted Jennifer for an extension of a temporary occupancy.
|
FIR-Aging Inspection | 7/2/2010 | 7/2/2010 | 7/6/2010 | | NR |
Troy Cobbley
|
|
|
Per Mike the tenant is waiting for funding to finish this project.
|
INSP-Conference | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and found that the restroom has been installed and stairs have been installed to the mezzanine both are lacking sprinkler protection. I spoke to Mike about getting the permit finished.
|
INSP-Final Inspection | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the restroom in the vault is complete and the mezzanine is complete.
|
INSP-Sprinkler Rough-in | 10/12/2007 | 10/12/2007 | 10/12/2007 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. The single head in the storage room is to be lowered so that it will provide coverage under the duct work.
|