INSP-Final Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 | A | PASS |
Forrest France
|
|
|
Verified corrections, seismic clearance provided, fire supply line flush completed, UG permit finaled.
|
INSP-Supply line flush | 8/22/2008 | 8/25/2008 | 8/25/2008 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed okay.
|
INSP-Supply line flush | 8/19/2008 | 8/19/2008 | 8/20/2008 | P | CANC |
Troy Cobbley
|
|
|
Per Roy a flush will not be performed until the parking lot pavement is done.
|
INSP-Final Inspection | 6/12/2008 | 6/12/2008 | 6/12/2008 | A | PART |
Forrest France
|
|
|
Permit final pending supply line flush.
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2008 | 5/27/2008 | 5/27/2008 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic testing for the new portion of installed pipe and ductile riser completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 5/21/2008 | 5/21/2008 | 5/21/2008 | P | CANC |
Forrest France
|
|
|
Duplicate inspection request already completed.
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PART |
Forrest France
|
|
|
Additional gate valve, new stub-in and ductile riser are approved for cover, need to plug the open cap at the riser and provide method for seismic clearance where the piping will pass through the floor slab, hydro and flushing not yet completed for this portion of work.
|
INSP-Supply line flush | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Troy Cobbley
|
|
|
The inspection today was for additional piping, a PIV vavle and the building stub-in. This work is not part of this permits scope of work. A separate permit is required. I contacted John at Commercial Fire about it.
|
INSP-Sprinkler Rough-in/Hydro | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PART |
Forrest France
|
|
|
Final pending supply line flush completion and future building construction for floor slab seisimic clearance.
|
INSP-Sprinkler Rough-in/Hydro | 11/21/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Forrest France
|
|
|
Underground hydro passed..will be capped off until future building is built..As per KR
|
INSP-Sprinkler Rough-in/Hydro | 11/21/2007 | 11/27/2007 | 11/21/2007 | A | CANC |
Forrest France
|
|
|
Phone #: ###-#### Internet Inspection Request from: John Warnick Inspection cancelled from web by: John Warnick
|
INSP-Final Inspection | 11/9/2007 | 11/13/2007 | 11/13/2007 | A | PART |
Forrest France
|
|
|
Under ground piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/9/2007 | 11/9/2007 | 11/11/2007 | P | FAIL |
Forrest France
|
|
|
Ok to cover under ground from the north west corner of the existing building to the future building. NOT OK TO COVER FROM NORTH WEST CORNER OF EXISTING BUILDING TO WATER MAIN, LESS THAN 4' 6" DEEP REQUIRED CODE IS 4' 6".MANY AREAS WERE 3" to 6" TO SHALLOW. DO NOT COVER UNTIL FIELD INSPECTED.
|
INSP-Sprinkler Rough-in | 11/8/2007 | 11/8/2007 | 11/8/2007 | P | FAIL |
Forrest France
|
|
|
Plans and permit documents for the UG work could not be located on site at the time of inspection, also noted depth of bury at some locations does not meet min. 4'6" (2"-6" shallow).
|