Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-00909
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 6418 W GOWEN RD
Project NameCATE EQUIPMENT
Customer Number 
ePlanReview 
Description
Scope of Work: Overhead & Underground
The Underground scope of work includes connecting to an existing C-900 connection from a gate valve near the property line, which was provided by others. Run the new section of 6” C-900 165’-0” out and up into the riser room. The underground supply will be controlled from a Wall PI located on the West side of the bldg. A new hydrant will be added by others, to be supplied from a separate UG tap off of the 8” loop. The sprinkler supply and Hydrant lines will be run with 18” of separation. The overhead fire sprinkler scope of work includes installing a 4” wet riser and a tree system to serve through out the entire 14,715-ft/2 two story bldg. The new facility will be built for heavy equipment repair and parts storage of Class IV up to 10’-0” in-rack. Any future racking plans shall be submitted under a separate permit. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD07-02067.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/4/20086/5/20086/5/2008APASS
DetailsTroy Cobbley
permit finaled
INSP-Final Inspection6/3/20086/4/20086/4/2008PFAIL
DetailsTroy Cobbley
The flow switch needs replaced and retested.
INSP-Sprinkler Rough-in/Hydro4/25/20084/28/20084/28/2008APASS
DetailsTroy Cobbley
Overhead hydro for first and second floor complete. KR
INSP-Supply line flush4/22/20084/23/20084/23/2008PPASS
DetailsTroy Cobbley
The underground flush passed
INSP-Sprinkler Rough-in/Hydro4/22/20084/23/20084/23/2008PPASS
DetailsTroy Cobbley
Underground hydro passed
INSP-Sprinkler Rough-in4/10/20084/10/20084/10/2008PPASS
DetailsTroy Cobbley
The underground sprinkler piping is ok to cover
INSP-Sprinkler Rough-in3/19/20083/20/20083/20/2008PPASS
DetailsTroy Cobbley
See the city approved plans for the two rooms where the sprinkler piping is ok to cover. I found one pendant head spaced too far from a wall in one of these two rooms. The fitter started correcting this prior to my leaving. The earthquake bracing. Also the last earthquake brace is missing from the below mezzanine piping. Prior to ceilings being installed below the mezzanine another rough-in inspection for armovers/hangers will be required. None of the overhead piping for the main fire sprinkler system was inspected. Per the fitter several heads are being added due to a large beam and a wall around the stairs. The added heads at the beam appear to end up in one of the remote areas. The plans will need to be resubmitted for verification of additional heads flowing water in the remote area. I notified the fitter of this.
INSP-Sprinkler Rough-in12/10/200712/11/200712/11/2007APART
DetailsTroy Cobbley
The in building riser/stubout is ok to cover. The remaining underground has not been installed yet.