INSP-Final Inspection | 6/24/2008 | 6/24/2008 | 6/24/2008 | P | PASS |
Forrest France
|
|
|
Correction notice items verified for completion, OH fire sprinkler permit finaled.
|
INSP-Final Inspection | 6/20/2008 | 6/23/2008 | 6/23/2008 | A | FAIL |
Forrest France
|
|
|
Provide certification for the RPB, relocate the automatic ball drip for the fire dept. connection, provide missing "911" sign at the outside bell, provide pitot and playpipe for functional forward flow testing per review notes, need to attatch calc stickers, riser signage, state tag etc.
|
INSP-Sprinkler Rough-in/Hydro | 5/22/2008 | 5/23/2008 | 5/23/2008 | A | PART |
Forrest France
|
|
|
Hydrostatic testing for the new system piping branch lines and pendent heads passed.
|
INSP-Sprinkler Rough-in | 5/20/2008 | 5/21/2008 | 5/22/2008 | A | PART |
Forrest France
|
|
|
System modifications per plan resubmittals completed okay, will need a hydrostatic test for the new heads and piping, noted missing ball drip at the FDC, also discussed items needed for final including forward flow test, alarm interconnections, etc.
|
INSP-Conference | 3/14/2008 | 3/18/2008 | 3/18/2008 | A | DONE |
Forrest France
|
|
|
On site visit regarding the requirement for extended coverage pendent sprinklers at the sales floor area to meet NFPA 13 2002 table 8.8.5.1.2(a) to avoid obstructions to discharge.
|
INSP-Sprinkler Rough-in | 3/3/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Forrest France
|
|
|
Overspaced head at the restroom area, EC heads adjacent to the south and west walls of the sales floor area do not meet table 8.8.5.1.2 per NFPA 13 for clearance to ceiling mounted obstructions.
|
INSP-Sprinkler Rough-in/Hydro | 1/28/2008 | 1/29/2008 | 1/29/2008 | P | PART |
Forrest France
|
|
|
Hydrostatic tests for the overhead wet and antifreeze systems as well as the underground supply piping passed.
|
INSP-Final Inspection | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | PART |
Forrest France
|
|
|
Overhead rough-in inspection only, noted one missing ret. strap, one missing hanger, two overspaced heads at the hard lid ceiling restroom areas, the antifreeze loop piping is not yet tied in to the riser, riser not complete at this time, see approved plan set for annotations, hydrostatic testing not ready due to start pressure well below 200psi., remainder of OH rough-in is acceptable.
|
INSP-Conference | 1/23/2008 | 1/24/2008 | 1/24/2008 | A | DONE |
Forrest France
|
|
|
On site conference with regard to location of the FDC.
|