Permit Information
Permit NumberFIR07-01005
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 250 E PARKCENTER BLVD
Project Name 
Customer Number 
ePlanReview 
Description
The Permitted Work Scope: Over Head Only
Modify the existing system by adding 71 QR heads to accommodate a new ceiling layout. The existing standard response heads throughout the 257,200-ft/2 facility with exception of the atrium, will be changed out to Quick Response type heads. Fourteen hundred heads will be affected out side of the construction area of 17,460-ft/2 permitted due to this part of the scope. The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to BLD07-02967.
When tenant work affects fire sprinkler protection outside the permitted work area due to the installation of tenant-demising or new partition walls, the affected area sprinkler coverage outside the BLD permit will fall under the Fire Permit scope of work, to maintain the required fire protection within the fire sprinklered facility. The “Riser” and its supplies which include all appurtenances (including tamper, alarm and alarm monitoring) relating to the normal and correct function and integrity of this system will fall under the jurisdiction for code compliant verification. 4/18/08-SCOPE MODIFICATION: The "plan approval" done in conjunction with this permit includes the replacement of existing standard response sprinklers with QR sprinklers as stated above, however the "scope" of this permit is modified so this "permit" will apply only to the work to be completed within the area associated with TI permit BLD07-02967, i.e. 71 sprinkler heads involved. The installation of QR heads throughout the remainder of the building will occur as TI work is done in 12 separate "phases", each under a separate building (BLD) permit, over the next 2-3 months. Separate FIR permit applications will be submitted by TVFP for sprinkler modifications to be made in conjunction with the TI work to be done under each of those building permits. SLR
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIR-Aging Inspection1/27/20091/27/20091/27/2009PDONE
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection1/26/20091/26/20091/27/2009PPASS
DetailsForrest France
Noted corrections verified for completion, fire sprinkler permit finaled.
INSP-Final Inspection1/22/20091/23/20091/26/2009PPART
DetailsForrest France
Hydrostatic testing for each system at all four building risers completed satisfactory, final walkthrough also completed for head change-out. Discovered 5 remaining heads to be changed at the mens locker room area 1st floor, missing ceiling tiles at the offices behind the front reception counter, and two missing escutcheons (installed while on site). NOTE: Site inspection completed on Sat. 1/24/09 per request.
INSP-Sprinkler Rough-in/Hydro1/26/20091/26/20091/26/2009ADONE
DetailsForrest France
Duplicate inspection
INSP-Conference1/13/20091/13/20091/13/2009PDONE
DetailsForrest France
Regarding after hours site inspection request.
INSP-Sprinkler Rough-in/Hydro11/7/200811/10/200811/10/2008ACANC
DetailsTroy Cobbley
raul - late morning Phone #: ###-####
INSP-Final Inspection1/31/20081/31/20081/31/2008PPASS
DetailsForrest France
Permit work is complete, c/n item has been done, fire sprinkler permit finaled.
INSP-Sprinkler Rough-in1/9/20081/10/20081/10/2008APART
DetailsForrest France
See areas on approved plans okayed for cover at the drop ceilings, noted one head to be added as red-lined due to a column obstruction-can be verified at final insp.