FIR-Aging Inspection | 1/27/2009 | 1/27/2009 | 1/27/2009 | P | DONE |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/26/2009 | 1/26/2009 | 1/27/2009 | P | PASS |
Forrest France
|
|
|
Noted corrections verified for completion, fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/22/2009 | 1/23/2009 | 1/26/2009 | P | PART |
Forrest France
|
|
|
Hydrostatic testing for each system at all four building risers completed satisfactory, final walkthrough also completed for head change-out. Discovered 5 remaining heads to be changed at the mens locker room area 1st floor, missing ceiling tiles at the offices behind the front reception counter, and two missing escutcheons (installed while on site). NOTE: Site inspection completed on Sat. 1/24/09 per request.
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2009 | 1/26/2009 | 1/26/2009 | A | DONE |
Forrest France
|
|
|
Duplicate inspection
|
INSP-Conference | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | DONE |
Forrest France
|
|
|
Regarding after hours site inspection request.
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2008 | 11/10/2008 | 11/10/2008 | A | CANC |
Troy Cobbley
|
|
|
raul - late morning Phone #: ###-####
|
INSP-Final Inspection | 1/31/2008 | 1/31/2008 | 1/31/2008 | P | PASS |
Forrest France
|
|
|
Permit work is complete, c/n item has been done, fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 1/9/2008 | 1/10/2008 | 1/10/2008 | A | PART |
Forrest France
|
|
|
See areas on approved plans okayed for cover at the drop ceilings, noted one head to be added as red-lined due to a column obstruction-can be verified at final insp.
|