INSP-Final Inspection | 1/15/2008 | 1/16/2008 | 1/16/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler work passed final inspection, two pendents adjusted while on site, field modifications acceptable, permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/10/2008 | 1/11/2008 | 1/11/2008 | A | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok to cover
|