Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR07-01030
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 1620 W RIVER ST
Project NameINTERFAITH SANCTUARY
Customer Number 
ePlanReview 
Description
PHASE 2 - Limited Scope: to install the overhead throughout the remaining half of the building but does NOT include installation of the underground main and water connection. The overhead system will remain a dry pipe, manual system per approval of the fire chelf, Renn Ross and Fire Marshal Dave Hanneman. The water connection and riser are still expected to be installed in Feb/Mar when grant funds become available, and that work will be done under a Phase 3 permit. Phase 1 and Phase 2 pemits will remain in the PART approved status until the complete system is finaled under Phase 3. These Phase 2 plans are approved for installation, but as with Phase 1, will not be officially "ISSUED", since this is still a partial system installation.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  8/3/2009 DONE
finaled by tim frost
INSP-Sprinkler Rough-in/Hydro12/20/200712/21/200712/21/2007PPART
DetailsForrest France
Verified OH hydrostatic test, noted coverage obstruction at one location, need to provide relief valve at the riser due to the grid system design.