Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR07-01032
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 1130 N ALLUMBAUGH ST
Project NameVALLEY VIEW
Customer Number 
ePlanReview 
Description
Original Scope of Work: The scope if work includes modifying the existing wet system to meet requirements through out the heated spaces. The existing wet system will be modified by adding and relocating heads in the corridors and adding a new system in the new construction areas. An antifreeze system will be added to serve the cold breeze way. The existing riser shall be modified to include a listed double check back flow device.
The fire sprinkler system work shall comply with the IFC 2003, the attached review comments/conditions, as regulated by the Fire Chief. The review comments/conditions, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD07-01834.

Valley View Retirement Center: Skilled Nursing Facility FIR07-01032
Revised Scope of work: 1.Replace standard response heads in the corridors, remodeled areas and the residences rooms only to a quick response type.
2. Add a forward flow device to the existing fire sprinkler riser room.
3. Add a new backflow device to the existing fire sprinkler system.
3. Add to the existing fire sprinkler systems to accommodate the new additions.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/9/200910/9/200910/9/2009PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection10/6/200910/6/200910/6/2009PCANC
DetailsTroy Cobbley
Wrong permit number called in for inspection.
INSP-Sprinkler Rough-in9/17/20099/21/20099/21/2009PCANC
DetailsTroy Cobbley
Duplicate inspection
INSP-Sprinkler Rough-in/Hydro9/17/20099/21/20099/21/2009PPASS
DetailsTroy Cobbley
Overhead hydro test passed.
INSP-Sprinkler Rough-in/Hydro9/14/20099/17/20099/17/2009PCANC
DetailsForrest France
James Phone #: ###-####
INSP-Sprinkler Rough-in9/9/20099/10/20099/10/2009APASS
DetailsTroy Cobbley
See the city approved plans for locations where the piping can be covered.
INSP-Sprinkler Rough-in9/4/20099/8/20099/8/2009APASS
DetailsTroy Cobbley
See the city approved plans for the piping that is ok for cover.
INSP-Sprinkler Rough-in9/2/20099/3/20099/3/2009APASS
DetailsTroy Cobbley
Sprinkler piping in the residence rooms as marked on the city approved plans is ok to cover.
INSP-Sprinkler Rough-in8/18/20098/18/20098/19/2009PPASS
DetailsTroy Cobbley
The sprinkler piping in the kitchen area can be covered.
INSP-Sprinkler Rough-in8/13/20098/14/20098/14/2009AFAIL
DetailsTroy Cobbley
James Phone #: ###-#### The contact did not answer the phone and I did not know which areas were to be inspected. I did re-inspect in the kitchen but found combustibles still present above the ceiling.
INSP-Sprinkler Rough-in8/11/20098/12/20098/12/2009APART
DetailsTroy Cobbley
See the city approved plans for the piping/rooms in the kitchen area that passed rough-in. The piping can not be covered due to combustibles located above the ceiling that need addressed. I spoke to John with Petra about this item.
INSP-Sprinkler Rough-in8/7/20098/10/20098/10/2009PCANC
DetailsTroy Cobbley
James-cover up inspection please Phone #: ###-#### Cancelled per Jim.
INSP-Final Inspection6/30/20096/30/20096/30/2009PPART
DetailsTroy Cobbley
The sprinklers are complete in the new shower room of skilled nursing second floor.
INSP-Final Inspection6/29/20096/29/20096/29/2009PPART
DetailsTroy Cobbley
1st & 2nd Floor area B of Skilled Nursing Sprinklers Complete
INSP-Sprinkler Rough-in/Hydro6/23/20096/24/20096/24/2009APASS
DetailsTroy Cobbley
The hydro test for the new piping in skilled nursing, first floor, passed.
INSP-Sprinkler Rough-in6/19/20096/22/20096/22/2009APASS
DetailsTroy Cobbley
See the city approved plans for locations with todays date where the sprinkler piping can be covered.
INSP-Sprinkler Rough-in6/18/20096/19/20096/19/2009PDEFR
DetailsForrest France
jim Phone #: ###-####
INSP-Sprinkler Rough-in6/16/20096/17/20096/17/2009PPART
DetailsTroy Cobbley
See the on site as-built plans for locations where the sprinkler piping is ok for cover dated for today.
INSP-Final Inspection6/2/20096/3/20096/3/2009APASS
DetailsTroy Cobbley
The sprinklers are complete in the new first floor exit passage way at the skilled nursing area.
INSP-Sprinkler Rough-in5/13/20095/13/20095/13/2009PPASS
DetailsTroy Cobbley
See the city approved plans for locations with todays date where the sprinkler piping can be covered.
INSP-Sprinkler Rough-in/Hydro5/11/20095/12/20095/12/2009APASS
DetailsTroy Cobbley
See the new ste of as-builts for location with todays date where the sprinkler piping is ok to cover. This includes the skilled nursing, second floor are a"B". Also the hydro test for this area passed.
INSP-Sprinkler Rough-in5/11/20095/11/20095/11/2009PCANC
DetailsTroy Cobbley
Will need to be rescheduled due to time constraints.
INSP-Sprinkler Rough-in/Hydro5/11/20095/11/20095/11/2009PFAIL
DetailsTroy Cobbley
The above ground hydro test for the second floor of the skilled nursing failed.
INSP-Sprinkler Rough-in/Hydro5/8/20095/11/20095/11/2009APASS
DetailsTroy Cobbley
See the city approved plans for locations with todays date where the sprinkler piping can be covered.
INSP-Conference5/8/20095/11/20095/11/2009APASS
DetailsTroy Cobbley
The as-built plans have been consolidated to one set of plans for each of the two areas. As per Brad copies of these two plans will be submitted to the city of boise for their final review. These set of plans to be used for all future inspections.
INSP-Sprinkler Rough-in5/4/20095/5/20095/5/2009AFAIL
DetailsTroy Cobbley
No inspection was performed due to the city approved plans and as-builts not matching the installation. Provide city approved plans that match the installation.
INSP-Sprinkler Rough-in4/30/20095/1/20095/1/2009APASS
DetailsTroy Cobbley
This was for a conference in the shower areas dealing with pendant sprinkler coverage and curtains.
INSP-Sprinkler Rough-in4/29/20094/29/20094/29/2009PPASS
DetailsTroy Cobbley
I went over sprinkler coverage under soffits in the second floor of the skilled nursing area. It appears that the placement of the pendant sprinkler heads will provide adequate coverage.
INSP-Final Inspection2/23/20092/24/20092/24/2009PPART
DetailsTroy Cobbley
The sprinkler work is complete in both the first floor and second floor dining areas. An ok to cover was also given for the first floors nurses station. See the city approved plans for the exact area covered with todays date and my signature.
INSP-Final Inspection2/17/20092/18/20092/18/2009APART
DetailsTroy Cobbley
The north and south ends of the ILF are finished.
INSP-Sprinkler Rough-in/Hydro2/5/20092/5/20092/5/2009PPASS
DetailsTroy Cobbley
The hydro test for the first floor skilled nursing dining room passed.
INSP-Sprinkler Rough-in/Hydro1/29/20091/30/20091/30/2009APASS
DetailsTroy Cobbley
The hydro test for the second floor skilled nurse dining area passed.
INSP-Sprinkler Rough-in1/28/20091/29/20091/29/2009APASS
DetailsTroy Cobbley
See the dated as-built plans for the second floor skilled nursing area where sprinkler piping is ok to cover.
INSP-Sprinkler Rough-in1/22/20091/22/20091/23/2009PFAIL
DetailsTroy Cobbley
The hydro test for the second floor skilled nursing dining area failed.
INSP-Sprinkler Rough-in1/20/20091/21/20091/22/2009APASS
DetailsTroy Cobbley
See the as-builts with the date of 1-21-2009 for the location where the sprinkler piping is ok to cover
INSP-Sprinkler Rough-in1/6/20091/7/20091/7/2009PPASS
DetailsTroy Cobbley
See the second floor as-built plans for the corridor and dining areas that are approved for cover.
INSP-Sprinkler Rough-in11/14/200811/17/200811/17/2008APART
DetailsForrest France
Overhead install at the new exterior porch adjacent to the skilled nursing area 1st floor okayed for cover, also verified as-builts for field modifications at the 2nd floor dining area.
FIR-Aging Inspection9/12/20089/12/20089/12/2008 NR
DetailsTroy Cobbley
Work is in progress