INSP-Final Inspection | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/30/2008 | 1/30/2008 | 1/30/2008 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | FAIL |
Forrest France
|
|
|
Need to provide matched response heads at the mill/lathe and lab room areas.
|
INSP-Sprinkler Rough-in | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Troy Cobbley
|
|
|
The sprinkler piping is ok to cover. No pendant heads/arm-overs have been installed on the drop piping in the larger area. Hangers have been installed at the deck in this location.
|