Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR08-00026
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 9272 PIERCE PARK RD
Project NameSPR-PIERCE PARK HORSE ARENA
Customer Number 
ePlanReview 
Description
To install approximately 10 feet of 6" C-900 underground fire sprinkler supply for future building. This work represents a portion of the overall total underground supply that will be run to the fire protection water supply tank at a later date. The remainder of the under ground connecting the tank to the building will be installed under a seperate fire sprinkler permit. This work is associated with BLD07-02354.Scope of Work:
Beginning from an existing 6” UG Gate valve located at the foundation line of a proposed 50,000 gallon gravity tank, run 800’ of 6” C900 out and rise up into the riser room of a new15,010-ft/2 bldh. The riser piece will be of ductile iron.pipe. The fire sprinkler underground work shall comply with NFPA 13-2007, NFPA 24-2007 the IFC-2006, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire “Inspection Card” are required to be on site as a condition of this work, to provide witness of compliance verification of minimum fire code. This permit is attached to building permit: BLD07-02354 & OH permit FIR08-00036.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/23/20087/23/20087/23/2008PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in2/28/20082/28/20082/28/2008PPASS
DetailsTroy Cobbley
The remaining underground piping up to the tank pad is ok to cover.
INSP-Sprinkler Rough-in2/26/20082/27/20082/27/2008APASS
DetailsTroy Cobbley
One more lenght of pipe beyond the power pole was installed for this inspecton and is ok to cover.
INSP-Sprinkler Rough-in2/19/20082/19/20082/19/2008PPASS
DetailsTroy Cobbley
The thrust block is ok to bury.
INSP-Sprinkler Rough-in2/15/20082/15/20082/15/2008PPASS
DetailsTroy Cobbley
The underground piping from the stubout to the power pole is ok to cover except for the 22 degree fitting which will need a thrust block.
INSP-Sprinkler Rough-in1/15/20081/15/20081/15/2008PPASS
DetailsTroy Cobbley
The 5' stub out is ok to cover.